Coverart for item
The Resource Construction cost of Air Force Atlas and Titan missile sites. : Hearing, Eighty-seventh Congress, second session. March 2, 1962

Construction cost of Air Force Atlas and Titan missile sites. : Hearing, Eighty-seventh Congress, second session. March 2, 1962

Label
Construction cost of Air Force Atlas and Titan missile sites. : Hearing, Eighty-seventh Congress, second session. March 2, 1962
Title
Construction cost of Air Force Atlas and Titan missile sites.
Title remainder
Hearing, Eighty-seventh Congress, second session. March 2, 1962
Creator
Subject
Language
eng
Government publication
federal national government publication
Illustrations
illustrations
Index
no index present
LC call number
UG633
LC item number
.A413 1962a
Literary form
non fiction
Label
Construction cost of Air Force Atlas and Titan missile sites. : Hearing, Eighty-seventh Congress, second session. March 2, 1962
Instantiates
Publication
Carrier category
volume
Carrier MARC source
rdacarrier
Content category
text
Content type MARC source
rdacontent
Dimensions
24 cm.
Extent
iii, 57 p.
Lccn
62061035
Media category
unmediated
Media MARC source
rdamedia
Other physical details
tables.
System control number
  • (LGTO)(RLIN)CUBGGLAD16950445-B
  • (CU)GLAD16950445-B
  • (OCoLC)ocn369254404
Label
Construction cost of Air Force Atlas and Titan missile sites. : Hearing, Eighty-seventh Congress, second session. March 2, 1962
Publication
Carrier category
volume
Carrier MARC source
rdacarrier
Content category
text
Content type MARC source
rdacontent
Dimensions
24 cm.
Extent
iii, 57 p.
Lccn
62061035
Media category
unmediated
Media MARC source
rdamedia
Other physical details
tables.
System control number
  • (LGTO)(RLIN)CUBGGLAD16950445-B
  • (CU)GLAD16950445-B
  • (OCoLC)ocn369254404

Library Locations

    • Harold B. Lee Library Brigham Young University, Provo, UT, 84602, US
      40.249156 -111.649242
Processing Feedback ...